PT Harapan Tahrin Kapital (HTK) has successfully completed a General Overhaul (GOH) of two CAT 3512 B gensets at the GW123 Rig, owned by PT Greatwall Drilling Asia Pacific and located in Bula, Seram Timur, Maluku. This significant project reaffirms HTK’s expertise in providing essential maintenance services to the energy and drilling industries.
The gensets at the GW123 Rig are the backbone of its power system, providing the energy needed to keep operations running smoothly in the challenging environment of Seram Timur. The General Overhaul was critical to maintaining the reliability and performance of these machines.
HTK’s experienced team carried out the overhaul, which included a full inspection of all key components, replacement of parts subject to wear and tear, and comprehensive testing to ensure everything functions as expected. The work done will extend the life of these gensets and enhance their operational efficiency, providing reliable power for the rig’s ongoing drilling activities.
Located in a remote region, Rig GW123 is central to PT Greatwall Drilling Asia Pacific’s activities. Maintaining the gensets at peak performance is crucial for uninterrupted drilling operations, especially in isolated areas like Bula, Seram Timur, where external power sources are scarce.
By completing the General Overhaul on the CAT 3512 B gensets, HTK has ensured that GW123 Rig will have a stable and dependable power supply, allowing PT Greatwall Drilling Asia Pacific to focus on their core drilling operations with confidence.